Hacking prices in Singapore depend on the type of work: a single HDB partition wall typically runs S$1,500 to S$3,000, floor tile hacking about S$3 to S$8 per square foot, and haulage and debris clearance S$500 to S$1,500 per job. This page gathers the published market ranges for each common job in one table, so you can budget before you ask for quotes.

These are market figures from published Singapore sources, listed at the end of the page. They are not our prices, and a site survey gives the final quote.

Hacking price table by job type

Use this table for an early budget. Each row links to the service page with more detail.

JobTypical market rangeMore detail
Wall hacking, single non-structural wall (HDB)S$1,500 to S$3,000Wall hacking cost guide
Wall hacking, rate per m²S$100 to S$250 per m²Wall hacking
Brick or masonry partition removalS$400 to S$1,200 per wall, or S$25 to S$60 per m²Partition wall removal
Floor tile hackingS$3 to S$8 psfFloor and tile hacking
Screeding after floor hackingS$1 to S$3 psfFloor hacking cost
Floor hacking and screed combinedS$4 to S$11 psfFloor hacking cost
Toilet and bathroom hackingPriced by scope after survey; floor portions follow the tile rates aboveToilet hacking cost
Kitchen hacking and dismantlingPriced by scope after surveyKitchen hacking
False ceiling and cornice hackingPriced by area after surveyFalse ceiling hacking
Carpentry and wardrobe dismantlingPriced by item and volume after surveyCarpentry dismantling
Haulage and debris clearance, per jobS$500 to S$1,500Dismantling and disposal
Single small-lorry trip, labour and disposalS$300 to S$500Debris disposal guide
Professional Engineer endorsement, where requiredS$800 to S$2,000HDB permit guide

Where a row says "priced after survey", we could not find a published figure reliable enough to repeat. Kitchens, toilets and ceilings vary too much in what is fitted and what sits behind the finishes for a single number to mean anything.

What every hacking price should include

A comparable price covers the hacking itself, protection, debris removal and disposal, and says clearly what is left out.

  • Protection of floors, walls and fittings that stay, and of lifts and corridors where the building requires it.
  • The hacking work, described by area, item or wall, not just "hacking works".
  • Bagging, haulage and disposal at a licensed facility, or the number of lorry trips included.
  • The permit submission for HDB flats, and any MCST application for condominiums.
  • A clean site at handover, swept and ready for the next trade.
  • Exclusions in writing: typically making good, waterproofing, electrical and plumbing changes, and new finishes.

The most common reason two quotes look far apart is that one includes disposal and making good and the other does not.

Factors that change your quote

The same job can be priced quite differently once the site is seen. These are the factors that move it most:

  1. Material. Brick, blockwork and thick screed are slower to break out and heavier to remove than board partitions or thin tile beds.
  2. Area and quantity. Per-unit rates often fall on larger jobs, because setup and protection are shared.
  3. What is behind the finish. Pipes, conduit and waterproofing membranes need careful work around them.
  4. Access. Upper floors without a service lift, long walks from the loading point, and restricted removal hours add labour.
  5. Building rules. MCST and mall conditions, after-hours work in office buildings, and deposits all add overhead.
  6. Approvals. A PE endorsement adds cost and time; so does redesigning a layout that would not be approved.

HDB vs condo vs commercial pricing

The hacking is similar across property types; the overhead around it is what differs.

HDB flats need an HDB permit and an HDB-listed contractor, and noisy works run only from 9am to 5pm on weekdays. That fixes how many working hours the job has.

Condominiums add MCST approval, a deposit, protection of common areas and set debris removal times. Our condo hacking page explains the usual conditions.

Commercial premises are often priced per square foot as part of reinstatement, and frequently involve after-hours work. Published office reinstatement ranges are around S$12 to S$20 per square foot; see our office reinstatement cost guide.

Typical jobs and how they come together

Most real jobs combine several rows of the price table, so it helps to see how they add up.

Bathroom and kitchen hacking in a condominium. In one of our condo projects, the bathroom wall and floor tiles, the tile bed and screed, and the kitchen floor threshold all came out ahead of a re-tile. The work took three days, with screened work areas, dust control, and a report on the condition of the waterproofing membrane before anything new went down. A job like this is priced on the tile area plus the screed, plus disposal.

Full flat strip-out with carpentry. In an HDB flat strip-out, built-in wardrobes, feature panelling and floor tiles were removed from an occupied flat over six days. Plywood wall protection and floor foam went in first, and debris was sorted on site. Here the price is driven by carpentry volume, tile area, the protection needed for an occupied home, and the number of disposal trips.

Single wall for an open layout. One partition removed, the edges made good, and the debris cleared. This is the job the wall hacking ranges describe most directly.

Ways to keep the total down

The cheapest hacking job is one planned once and done in a single visit.

  • Combine the hacking. Walls, floors, kitchen and toilet done together share one set of protection, one permit submission and fewer disposal trips.
  • Keep what is in good condition. Sound floor tiles can sometimes be overlaid rather than hacked; see our floor hacking cost article for when that works.
  • Clear loose items yourself. Furniture and loose fittings moved out before the crew arrives saves labour and disposal volume.
  • Fix the layout first. Every change after the permit is approved costs time and a new submission.

How to get an accurate quote

The fastest way to an accurate quote is to send enough for us to understand the job before the survey.

  • Photos of each area, including both sides of any wall and close-ups of floor and wall tiles.
  • The floor plan, and the structural plan if you have it.
  • What you want removed, marked on the plan if possible.
  • Building details: HDB, condo, landed or commercial, floor level, and any management rules you already know.
  • Timing, including key collection, lease end or handover dates.

With that, a site survey confirms the details and the quote can be firm. For a deeper look at wall jobs specifically, read the wall hacking cost guide. Other services: bathroom and toilet hacking, HDB wall hacking, BTO hacking, demolition works.

Request a quote with your photos and floor plan.

Sources for the figures on this page

Figures are published market ranges, reviewed October 2026. They are indicative only, and a site survey gives the final quote.

  • Published Singapore hacking contractor cost guides, 2026: wall hacking ranges, per m² rate, partition removal, haulage and lorry trip costs, PE endorsement, reinstatement per square foot.
  • SmartCalculator.sg, Flooring Cost Singapore (2026): floor tile hacking and screeding rates.
  • MyNiceHome (HDB): permit and contractor requirements, noisy works hours.

support_agent Get a firm price for your job

Any figures on this page are indicative market ranges, not a quote. We survey the site, confirm what needs approval, prepare the permit submission where one is required, and quote in writing.

request_quote Request a quote

Frequently asked questions

Do you charge for site surveys?

add
Tell us about the job when you request a quote and we will confirm whether a survey is needed and on what terms. For many jobs, photos and a floor plan are enough to give a firm quote without one.

Is debris disposal included in hacking prices?

add
It depends on the contractor, which is why it is worth checking. Published market ranges for haulage and debris clearance are about S$500 to S$1,500 per job. A clear quote says whether disposal is included or how many lorry trips are covered.

Do hacking prices include GST?

add
Ask each contractor to state whether their figures include GST, and compare quotes on the same basis. The market ranges on this page are published figures and do not specify GST treatment.

Why are toilet and kitchen hacking not given a single price?

add
What is fitted, how many layers of tiles there are, and what sits behind them vary too much from one flat to the next. Floor portions follow the published tile hacking rates of about S$3 to S$8 per square foot; the rest needs a survey.

Are these your prices?

add
No. They are market ranges published by Singapore sources, listed at the end of the page. They are here to help you budget. Our own price for your job comes in a written quote after we understand the site.

Get a site survey for your hacking works

Send us your floor plan or a few photos and we will advise what can be hacked, what needs a permit, and how long the works will take.