Hacking prices in Singapore depend on the type of work: a single HDB partition wall typically runs S$1,500 to S$3,000, floor tile hacking about S$3 to S$8 per square foot, and haulage and debris clearance S$500 to S$1,500 per job. This page gathers the published market ranges for each common job in one table, so you can budget before you ask for quotes.
These are market figures from published Singapore sources, listed at the end of the page. They are not our prices, and a site survey gives the final quote.
Hacking price table by job type
Use this table for an early budget. Each row links to the service page with more detail.
| Job | Typical market range | More detail |
|---|---|---|
| Wall hacking, single non-structural wall (HDB) | S$1,500 to S$3,000 | Wall hacking cost guide |
| Wall hacking, rate per m² | S$100 to S$250 per m² | Wall hacking |
| Brick or masonry partition removal | S$400 to S$1,200 per wall, or S$25 to S$60 per m² | Partition wall removal |
| Floor tile hacking | S$3 to S$8 psf | Floor and tile hacking |
| Screeding after floor hacking | S$1 to S$3 psf | Floor hacking cost |
| Floor hacking and screed combined | S$4 to S$11 psf | Floor hacking cost |
| Toilet and bathroom hacking | Priced by scope after survey; floor portions follow the tile rates above | Toilet hacking cost |
| Kitchen hacking and dismantling | Priced by scope after survey | Kitchen hacking |
| False ceiling and cornice hacking | Priced by area after survey | False ceiling hacking |
| Carpentry and wardrobe dismantling | Priced by item and volume after survey | Carpentry dismantling |
| Haulage and debris clearance, per job | S$500 to S$1,500 | Dismantling and disposal |
| Single small-lorry trip, labour and disposal | S$300 to S$500 | Debris disposal guide |
| Professional Engineer endorsement, where required | S$800 to S$2,000 | HDB permit guide |
Where a row says "priced after survey", we could not find a published figure reliable enough to repeat. Kitchens, toilets and ceilings vary too much in what is fitted and what sits behind the finishes for a single number to mean anything.
What every hacking price should include
A comparable price covers the hacking itself, protection, debris removal and disposal, and says clearly what is left out.
- Protection of floors, walls and fittings that stay, and of lifts and corridors where the building requires it.
- The hacking work, described by area, item or wall, not just "hacking works".
- Bagging, haulage and disposal at a licensed facility, or the number of lorry trips included.
- The permit submission for HDB flats, and any MCST application for condominiums.
- A clean site at handover, swept and ready for the next trade.
- Exclusions in writing: typically making good, waterproofing, electrical and plumbing changes, and new finishes.
The most common reason two quotes look far apart is that one includes disposal and making good and the other does not.
Factors that change your quote
The same job can be priced quite differently once the site is seen. These are the factors that move it most:
- Material. Brick, blockwork and thick screed are slower to break out and heavier to remove than board partitions or thin tile beds.
- Area and quantity. Per-unit rates often fall on larger jobs, because setup and protection are shared.
- What is behind the finish. Pipes, conduit and waterproofing membranes need careful work around them.
- Access. Upper floors without a service lift, long walks from the loading point, and restricted removal hours add labour.
- Building rules. MCST and mall conditions, after-hours work in office buildings, and deposits all add overhead.
- Approvals. A PE endorsement adds cost and time; so does redesigning a layout that would not be approved.
HDB vs condo vs commercial pricing
The hacking is similar across property types; the overhead around it is what differs.
HDB flats need an HDB permit and an HDB-listed contractor, and noisy works run only from 9am to 5pm on weekdays. That fixes how many working hours the job has.
Condominiums add MCST approval, a deposit, protection of common areas and set debris removal times. Our condo hacking page explains the usual conditions.
Commercial premises are often priced per square foot as part of reinstatement, and frequently involve after-hours work. Published office reinstatement ranges are around S$12 to S$20 per square foot; see our office reinstatement cost guide.
Typical jobs and how they come together
Most real jobs combine several rows of the price table, so it helps to see how they add up.
Bathroom and kitchen hacking in a condominium. In one of our condo projects, the bathroom wall and floor tiles, the tile bed and screed, and the kitchen floor threshold all came out ahead of a re-tile. The work took three days, with screened work areas, dust control, and a report on the condition of the waterproofing membrane before anything new went down. A job like this is priced on the tile area plus the screed, plus disposal.
Full flat strip-out with carpentry. In an HDB flat strip-out, built-in wardrobes, feature panelling and floor tiles were removed from an occupied flat over six days. Plywood wall protection and floor foam went in first, and debris was sorted on site. Here the price is driven by carpentry volume, tile area, the protection needed for an occupied home, and the number of disposal trips.
Single wall for an open layout. One partition removed, the edges made good, and the debris cleared. This is the job the wall hacking ranges describe most directly.
Ways to keep the total down
The cheapest hacking job is one planned once and done in a single visit.
- Combine the hacking. Walls, floors, kitchen and toilet done together share one set of protection, one permit submission and fewer disposal trips.
- Keep what is in good condition. Sound floor tiles can sometimes be overlaid rather than hacked; see our floor hacking cost article for when that works.
- Clear loose items yourself. Furniture and loose fittings moved out before the crew arrives saves labour and disposal volume.
- Fix the layout first. Every change after the permit is approved costs time and a new submission.
How to get an accurate quote
The fastest way to an accurate quote is to send enough for us to understand the job before the survey.
- Photos of each area, including both sides of any wall and close-ups of floor and wall tiles.
- The floor plan, and the structural plan if you have it.
- What you want removed, marked on the plan if possible.
- Building details: HDB, condo, landed or commercial, floor level, and any management rules you already know.
- Timing, including key collection, lease end or handover dates.
With that, a site survey confirms the details and the quote can be firm. For a deeper look at wall jobs specifically, read the wall hacking cost guide. Other services: bathroom and toilet hacking, HDB wall hacking, BTO hacking, demolition works.
Request a quote with your photos and floor plan.
Sources for the figures on this page
Figures are published market ranges, reviewed October 2026. They are indicative only, and a site survey gives the final quote.
- Published Singapore hacking contractor cost guides, 2026: wall hacking ranges, per m² rate, partition removal, haulage and lorry trip costs, PE endorsement, reinstatement per square foot.
- SmartCalculator.sg, Flooring Cost Singapore (2026): floor tile hacking and screeding rates.
- MyNiceHome (HDB): permit and contractor requirements, noisy works hours.