Partition Wall Removal in Singapore: Cost, Rules and Process
Brick, drywall and glass partitions removed from HDB flats, condominiums, landed homes and offices, with approvals and making good handled.
Partition wall removal in Singapore is one of the most requested renovation jobs, and one of the most regulated. Whether it is a brick wall between a kitchen and living room, a drywall partition in a BTO flat, or a glass wall in an office, the work only goes ahead once the wall is confirmed non-structural and the right approval is in place. This page explains the partition types, how to tell whether a wall can go, the rules for HDB flats, condominiums and landed homes, the timeline, and typical market costs.
Types of partition wall
Partitions in Singapore homes and offices are usually brick or blockwork, drywall or board, or glass. Each comes out differently.
Brick and blockwork
Common in older HDB flats and many condominiums. Heavy, often plastered and tiled, and frequently carrying electrical conduit or water pipes. Removal is noisy, dusty and generates a lot of debris, so it takes the most protection and the most disposal trips.
Drywall and board
Lightweight partitions of board fixed to a metal or timber frame. Found in some newer flats and in most offices. They can be dismantled in sections with less noise and dust, and the debris is lighter. The frame is fixed to the floor and ceiling, so those junctions need making good afterwards.
Glass
Mostly in offices and some condominiums: framed or frameless glass panels, often with doors. Removal is a careful dismantling job rather than demolition, with the glass handled and disposed of safely. See our office partition removal page for commercial jobs.
Load-bearing or not: how to tell
The only reliable way to tell is the structural plan. Tapping the wall, judging by thickness, or going by what a neighbour did are not good enough.
A load-bearing wall carries the floors above and transfers that load down through the building. In HDB flats these are reinforced concrete walls, and they cannot be removed or opened under any permit. A partition wall carries no load and can generally be removed with approval.
The difficulty is that the two can look identical once plastered and painted. A hollow sound when you knock is often given as a sign of a partition, but plenty of non-structural blockwork sounds solid, and finishes change the sound. HDB may also reject walls found to contain steel reinforcement or reinforced concrete. The structural plan for your flat marks which walls are reinforced concrete. Our article on structural and non-structural walls in HDB flats explains how to read it.
Some elements are off limits whatever the plan shows: the household shelter, reinforced concrete walls, columns, beams and floor slabs.
HDB vs condo vs landed rules
Every property type needs approval of some kind before a partition comes out. What differs is who gives it.
HDB flats
Prior HDB approval is needed for any partial or full hacking of walls, and the work must be carried out by a contractor listed in HDB's Directory of Renovation Contractors. As the flat owner you are responsible for getting the permit; the contractor normally submits it on your behalf. Some walls need a Professional Engineer (PE) endorsement before HDB will approve them. Noisy works such as wall demolition are allowed only from 9am to 5pm on weekdays, never on weekends or public holidays. Our HDB wall hacking page and HDB permit guide cover the process in detail.
Condominiums
Condominiums need MCST approval. Managements commonly require a renovation application with drawings, a refundable deposit, protection of lifts and corridors, and debris removal at set times. Structural restrictions still apply: a reinforced concrete wall in a condo cannot be removed any more than one in an HDB flat.
Landed homes
Landed homes have more freedom, but structural changes need a qualified engineer and the relevant approvals. Removing a non-structural partition is usually straightforward; anything that touches structure is a different project. See landed house hacking.
Opening vs full removal
You do not always need to remove the whole wall. An opening can give most of the benefit with less work, but it is not automatically cheaper.
A wide opening between kitchen and living room, a pass-through, or a half-height wall with a counter on top are all common alternatives to full removal. They keep some separation, leave space for switches and sockets, and can be easier to get approved. On the other hand, an opening needs neat reveals on three sides, and may need a lintel above it, which has to be shown in the application. Many contractors price a minimum length plus a rate per foot, so a large opening can cost close to a full removal.
Decide which you want before applying for the permit. Changing from an opening to a full removal after approval means a new application.
What happens to the floor and ceiling
Where a wall comes out, it leaves a strip in the floor and a line on the ceiling that need finishing.
In most flats, the floor tiles on either side of the wall stop at its base, so removing the wall leaves an untiled strip. That strip is either filled and tiled to match, covered by a new floor finish across the whole area, or used as a threshold detail. On the ceiling, the junction where the wall met it needs plastering and painting. Neither is difficult, but someone has to price and do it, and it is easier to plan from the start.
Partition removal in condominiums: what MCST usually asks for
Condo managements have their own checklists, and approval usually comes faster when the submission is complete.
- A renovation application form signed by the owner
- Drawings showing the wall to be removed
- Details of the contractor, including insurance
- A refundable renovation deposit
- Agreement to the working hours, lift protection and debris removal rules
Some managements also ask for an engineer's letter confirming the wall is non-structural. Ask the management office for their exact requirements before you fix dates. Our condo hacking page covers the common conditions.
Before work starts: services and protection
Services in the wall must be disconnected first, and everything that stays must be protected.
Partition walls often carry light switches, power points, data cables and sometimes water pipes. These are isolated and made safe before removal, and their new positions agreed so the electrician or plumber can reroute them. Floors, adjoining walls, doors and built-ins are protected against impact and dust. In an occupied home, dust screens around the work area make a large difference.
Timeline
Most single partition removals take one to two days on site. Approval is what sets the overall timeline.
- HDB permit: usually one to two weeks, and a month or more if a PE endorsement is needed.
- Condo MCST approval: varies by management, so ask early.
- On site: one to two days for a typical partition, longer for brick walls with tiles or for several walls together.
- Making good: plastering and junction repairs may run into an extra day, before re-tiling or painting.
Once an HDB permit is approved, the renovation should be completed within three months for a new flat and one month for an existing flat, so schedule the other trades to follow promptly.
Partition wall removal cost
Published market ranges put brick or masonry partition removal at about S$400 to S$1,200 per wall, or S$25 to S$60 per square metre. These are not our prices.
| Item | Typical market range |
|---|---|
| Brick or masonry partition removal | S$400 to S$1,200 per wall |
| Brick or masonry partition, per m² | S$25 to S$60 per m² |
| Single non-structural wall in an HDB flat, all-in hacking | S$1,500 to S$3,000 |
| Professional Engineer endorsement, where required | S$800 to S$2,000 |
The spread between published sources reflects what each figure covers. The lower per-wall figures generally describe the removal itself; the higher all-in HDB figures include protection, disposal and the permit work. For a full breakdown, see the wall hacking cost guide.
Thinking ahead: resale and future owners
Removing a partition is easy to undo on paper and harder in practice, so think about how the flat will be used later.
An open layout suits many households, but some buyers and tenants look specifically for a separate kitchen or an extra bedroom. Merging two bedrooms into one, for example, changes how the flat is described when it is sold or rented. Rebuilding a wall later is possible with approval, but it is a second renovation with its own cost. If you expect to sell or let the flat within a few years, a wide opening or a sliding partition can be a good compromise: most of the openness, with the option to close the space again.
Keep the approval documents and drawings for the works. They answer questions from future buyers, valuers and HDB, and they show the change was authorised.
Common mistakes
Nearly every partition removal problem comes from skipping a check at the start.
- Designing first, checking later. Paying for a layout that depends on removing a reinforced concrete wall.
- Relying on the tapping test. A hollow sound is not proof of anything.
- Starting before approval. Unauthorised hacking in an HDB flat can lead to a fine of up to S$5,000 and an order to reinstate.
- Forgetting the services. Switches and sockets in the wall need a new home, and that should be planned with the electrician.
- Not pricing the making good. The floor strip and ceiling line where the wall stood need finishing, and someone has to do it.
- Using an unlisted contractor. In an HDB flat, the contractor must be on HDB's directory.
Thinking about merging two rooms? Read hacking a wall to merge rooms in an HDB flat. Request a quote for partition wall removal with photos of both sides of the wall and your floor plan.
How we carry out the works
-
1
Confirm the wall
Check the structural plan and the wall itself to confirm it is non-structural and identify what runs through it.
-
2
Approval
Prepare the HDB permit or MCST application, with PE endorsement where required.
-
3
Isolate services
Disconnect and make safe any electrical, water or gas points in the wall.
-
4
Protect and remove
Protect floors and adjoining finishes, then remove the partition in controlled sections.
-
5
Make good and clear
Make good the floor, ceiling and wall junctions and remove all debris to licensed facilities.
check_circle What is included
- check Wall check against the structural plan
- check Permit or MCST application
- check Isolation of services in the wall
- check Protection of floors and adjoining finishes
- check Removal of the partition
- check Making good of junctions
- check Debris removal and disposal
cancel Not included
- remove Removal of structural or reinforced concrete walls
- remove Rerouting of electrical or plumbing beyond the wall
- remove Re-tiling or new floor finishes
- remove Painting