Wall hacking cost in Singapore usually falls between S$1,500 and S$3,000 for a single non-structural wall in an HDB flat, and rises to S$5,000 or more once several walls, a condominium or a landed house are involved. Those are published market ranges, not our prices. The figure for your flat depends on the wall material, how much of it comes out, what has to be made good afterwards, and whether an engineer needs to sign off.
This guide sets out the typical ranges by property type and by job, explains how contractors build a quote, and lists the extra costs that tend to appear late. Every figure is listed with its source at the end of the page.
Wall hacking cost in Singapore: the quick answer
For one partition wall in an HDB flat, budget roughly S$1,500 to S$3,000 before finishing works. Per square metre, published rates run from about S$100 to S$250, covering labour, equipment and disposal.
| Job | Typical market range |
|---|---|
| Single non-structural wall, HDB flat | S$1,500 to S$3,000 |
| Multiple walls, or walls in a condo or landed house | S$5,000 to S$10,000 |
| Extensive alterations needing structural work | S$15,000 and up |
| Rate per square metre of wall | S$100 to S$250 per m² |
| Brick or masonry partition removal | S$400 to S$1,200 per wall |
| Professional Engineer endorsement, where required | S$800 to S$2,000 |
Treat the table as a starting point for budgeting. Two flats with the same layout can produce quotes S$1,000 apart once the wall has been looked at, because the material and what sits inside it only become clear on site.
Cost by property type
Property type changes the cost mainly through wall construction, building rules and access, not through the hacking itself.
HDB resale flats
Older resale flats often have brick or blockwork partitions with thick plaster, tiles on one side, and services buried in the wall. Removing one is slower and heavier than in a new flat, and generates more debris. Published examples put a living room partition in a 2-room flat, about 12 m² of wall, at S$1,500 to S$2,500, and enlarging a master bedroom in a 4-room flat, about 8 m², at S$1,200 to S$2,000.
BTO flats
Many BTO partitions are lighter construction, which makes them quicker to take down. The catch is that recent BTO designs use reinforced concrete more widely, so fewer walls are candidates at all. A renovation guide from Qanvast puts hacking at around 10 to 20 percent of the total renovation budget for a BTO, against roughly 20 percent for a resale flat.
Condominiums
Condo walls are not dearer to hack, but the job carries more overhead. The management corporation (MCST) usually requires an application, a refundable deposit, protection of lifts and corridors, and debris removal at set hours. A kitchen-to-living wall of about 25 m² is quoted in published examples at S$3,500 to S$5,000.
Landed houses
Landed jobs are bigger in scale and more often involve structure. Opening up the first floor of a terrace, around 60 m² of wall, is quoted at S$8,000 to S$12,000 in published examples, and a large great-room project in a bungalow, around 180 m², at S$25,000 to S$40,000. A structural engineer's assessment, from about S$1,000, is often needed before any of that is priced. See our landed house hacking page for the approvals involved.
Cost by job
The shape of the job matters as much as the size of the wall.
- Full wall removal. The most common job, and the one the ranges above describe. The floor and ceiling junctions need making good afterwards.
- Half wall or partial removal. Often costs about the same as a full wall. The labour to set up, protect, cut cleanly and finish an edge is much the same, and a clean cut line can take longer than breaking out the whole panel.
- Opening for a doorway or pass-through. Smaller in area, but the opening may need a lintel above it and neat reveals on three sides, so the price does not fall in proportion to the area.
- Kitchen wall for an open concept. Usually a full or large partial removal, with extra care for gas, water and electrical points in or near the wall, and fire safety conditions to check in HDB flats.
How contractors price wall hacking
You will see three pricing methods in Singapore quotes, and it helps to know which one you are reading.
- Per foot run. Common for HDB wall hacking. Qanvast describes a minimum length of about 3 feet charged at a fixed price, then a rate per additional foot. This is why half a wall costs about the same as a full one.
- Per square metre. Used for larger areas and commercial work. Published ranges of S$100 to S$250 per m² generally include labour, equipment and disposal.
- Lump sum. One figure for the defined job. Easiest to compare, provided the quote says exactly what it covers.
None of these is more honest than the others. What matters is that the quote names the wall, the area, and what is and is not included.
What is included and what is not
A clear wall hacking quote should state each of these, either as included or as a separate line:
- Protection. Floor and wall protection inside the flat, plus lift and corridor protection where the building requires it.
- Debris disposal. Bagging, haulage and disposal at a licensed facility. Some quotes include it; others charge per lorry trip. See our guide to renovation debris disposal.
- Making good. Plastering the cut edges and the floor and ceiling junctions. Published plastering rates run about S$5 to S$10 per square foot.
- Electrical changes. Switches and sockets in the wall have to go somewhere. Published figures for adjustments after hacking are around S$200 to S$500.
- The permit submission. Covered in the next section.
A low quote that leaves out disposal and making good is not cheaper. It just moves those costs to a later invoice.
Extra costs: permit, PE endorsement, MCST deposit, touch-up
The main extras are an engineer's endorsement where the wall needs one, condo deposits, and finishing work that the hacking quote does not cover.
The HDB permit
All partial or full hacking of walls in an HDB flat needs HDB approval before work starts, and the contractor must be listed in HDB's Directory of Renovation Contractors. HDB's own renovation guidance does not list a separate fee for the permit. In practice, as Qanvast notes, contractors fold the application work into their quote, sometimes as a small admin line. If a quote shows a large "permit fee", ask what it covers. Our HDB hacking permit guide explains the process.
Professional Engineer endorsement
Some walls need a Professional Engineer (PE) to endorse the proposal before HDB will approve it. Published figures put this at S$800 to S$2,000. It also adds time: approval that usually takes one to two weeks can stretch to a month or more when a PE is involved.
MCST deposit and conditions
In a condominium, expect a refundable renovation deposit and rules on working hours, lift use and debris removal times. The deposit is not a cost if you get it back, but damage to common areas comes out of it.
Touch-up and finishing
Once the wall is gone, the floor where it stood usually has a gap in the tiles, and the ceiling has a line where the wall met it. Filling, re-tiling or re-levelling that strip is finishing work, and is often priced by whoever lays the new floor.
BTO drywall vs resale brick: why cost differs
Lightweight partitions come down faster and produce less, lighter debris than brick, so they usually cost less to remove.
A brick or blockwork wall in an older flat has to be broken out piece by piece, often with tiles and thick render attached, and every bag of rubble has to be carried out and hauled away. A lighter board or panel partition can be dismantled in larger sections with less noise and dust. The trade-off is that a newer flat may have fewer removable walls in the first place, so check the structural plan before you assume a layout is possible.
Our article on structural and non-structural walls in HDB flats explains how to find out which walls can go.
What to check before you budget
Before relying on any figure, confirm three things: that the wall is non-structural, what is inside it, and what the building will require.
- Is the wall removable? Get the structural plan for your flat. It marks reinforced concrete walls, which cannot be hacked under any permit. The household shelter is also permanently off limits, including drilling into it.
- What runs through it? Switches, sockets, data points, water pipes and gas lines in or near the wall have to be disconnected and rerouted first. Each one adds a small cost and a trade to coordinate.
- What finishes are attached? Tiles on one face, a feature panel, or built-in carpentry against the wall all add removal time and debris.
- What does the building require? HDB permits and noisy works hours, or MCST forms, deposits and removal times in a condominium.
- What happens after? Decide who makes good the floor strip, the ceiling line and the wall ends, and get it priced at the same time.
Getting these answered before the quote stage is what turns a market range into a firm price.
How long wall hacking takes, and what that means for cost
The hacking is short; the approvals and the follow-on trades are what stretch the programme.
Removing a single partition is often done in a day or two. HDB permit approval usually takes one to two weeks, and a month or more if a PE endorsement is needed. Once approved, HDB expects the renovation to be completed within three months for a new flat and one month for an existing flat. Noisy works can only run from 9am to 5pm on weekdays, never on weekends, public holidays or the eve of major public holidays, so a job that overruns on a Friday waits until Monday.
Time affects cost indirectly. A rushed permit or a layout change after approval means paying for the same preparation twice, and idle days between trades can delay the whole renovation. Our article on HDB renovation hours for hacking covers the timing rules in more detail.
How to save without cutting corners
The real savings come from planning the job well, not from choosing the lowest number.
- Decide the layout before you get quotes. Changing your mind after the permit is approved means a new application and more time.
- Group the hacking. Walls, floor tiles and kitchen strip-out done in one mobilisation share protection, permit work and disposal trips.
- Confirm the wall early. Paying for drawings of a layout that HDB will not approve is the most expensive mistake in this whole process.
- Compare like with like. Line up quotes against the inclusions list above before comparing totals.
- Do not skip the permit. Unauthorised hacking in an HDB flat can lead to a fine of up to S$5,000, plus the cost of reinstating the wall.
Worked example: 4-room resale open kitchen
For a typical open kitchen in a 4-room resale flat, a realistic all-in budget from published ranges is about S$2,200 to S$7,000. Most of the spread comes from whether a PE is needed and how much finishing is done.
| Item | Low | High |
|---|---|---|
| Remove kitchen partition (single non-structural wall) | S$1,500 | S$3,000 |
| PE endorsement, only if HDB requires one | S$0 | S$2,000 |
| Electrical adjustments | S$200 | S$500 |
| Plastering and finishing, about 100 sq ft | S$500 | S$1,000 |
| Extra disposal trip, if not included | S$0 | S$500 |
| Indicative total | S$2,200 | S$7,000 |
This is an illustration built from the market ranges on this page, not a quote. Re-tiling the floor strip and any new kitchen carpentry are separate. For a combined view of hacking prices across walls, floors, toilets and kitchens, see our hacking price list.
Getting a firm price
A firm price needs a look at the wall and the flat's structural plan. Send photos of both sides of the wall, your floor plan, and the layout you want, and we will tell you what can be approved and quote in writing. Related services: wall hacking, HDB wall hacking and BTO hacking.
Request a quote for your wall hacking job.
Sources for the figures on this page
Figures are published market ranges, reviewed October 2026. They are indicative only, and a site survey gives the final quote.
- Published Singapore hacking contractor cost guides, 2026: wall hacking ranges by property type, per m² rate, structural assessment, electrical and plastering costs, brick partition removal, PE endorsement.
- Qanvast, The Complete Guide to Hacking: pricing per foot run, hacking as a share of renovation budget, permit timelines and admin fees.
- MyNiceHome (HDB), How to Renovate Your HDB Flat: permit responsibility and the Directory of Renovation Contractors.
- Women's Weekly, Illegal HDB Renovations: fines of up to S$5,000.
support_agent Get a firm price for your job
Any figures on this page are indicative market ranges, not a quote. We survey the site, confirm what needs approval, prepare the permit submission where one is required, and quote in writing.