HDB Strip-out and disposal

Full Flat Strip-Out and Carpentry Dismantling

Built-in wardrobes, feature panelling and floor tiles removed from an occupied flat, with plywood wall protection and floor foam laid before works began.

Stripped interior with floor tiles removed and plywood wall protection in place

What the job involved

A flat was being stripped back before a full renovation. Built-in wardrobes, feature wall panelling, shelving and the existing floor tiles all had to come out, and the owner was keeping several finishes that were not part of the scope.

Protecting what stays

Before any tools came onto site we lined the retained walls with plywood sheeting and laid protective foam across the floors on the access route. Carpentry was taken apart in sections rather than broken up, which keeps dust down and makes the waste easier to sort.

Clearance

Debris was sorted on site, carried out through the lift lobby with the floors protected, and disposed of at a licensed facility. The unit was swept clean at the end of works and the protection removed.

Scope of works

  • check_circle Install plywood wall protection and floor foam
  • check_circle Dismantle built-in wardrobes and shelving
  • check_circle Strip out feature wall panelling
  • check_circle Remove floor tiles and bedding
  • check_circle Sort debris on site for disposal
  • check_circle Sweep clean and remove all protection at handover

Project photos

3 photos, tap any to enlarge

Protection laid before works began
Built-in carpentry taken apart in sections
Tiles up and panelling stripped, retained walls protected

Get a site survey for your hacking works

Send us your floor plan or a few photos and we will advise what can be hacked, what needs a permit, and how long the works will take.