Any hacking of walls inside an HDB flat needs written approval before the work starts. That approval is issued as a renovation permit. This guide sets out what needs one, who applies, what HDB will not approve under any circumstances, and what happens when works go ahead without permission.
The rules below come from HDB's published renovation guidelines. They are updated periodically, so confirm the current position with HDB or through your contractor before you fix dates.
Which works need a renovation permit
A permit is required for work that affects the structure of the flat, its fire protection, or its waterproofing. In practice that covers most of what people mean by hacking:
- Demolishing or partially removing any internal wall
- Forming a new opening in a wall, including a doorway or a pass-through
- Removing floor tiles and the screed beneath them
- Removing wall tiles in bathrooms, kitchens and service yards
- Relocating or altering an internal doorway
- Replacing windows or altering window openings
Cosmetic work generally does not need a permit. Painting, fitting loose furniture, replacing a tap or hanging a cabinet on an existing wall are not hacking works. The line falls at anything that removes part of the building rather than something attached to it.
Who applies for the permit
As the flat owner, you are responsible for obtaining every renovation permit your works need before they begin. In practice, the contractor submits the application on your behalf, and the contractor must be listed in HDB's Directory of Renovation Contractors. This is the most important practical consequence of the rules: if you engage someone who is not on HDB's directory, the work they carry out is unauthorised regardless of how well it is done.
Before engaging anyone, ask for their HDB registration and check it against HDB's published list of registered renovation contractors. It takes a minute and it is the difference between an approved job and an enforcement problem.
What HDB will not approve
Some elements are off limits and no permit will cover them. These are not negotiable and no contractor can obtain an exception:
- Structural walls. Reinforced concrete walls carry load from the floors above. Removing one compromises the block, not just the flat.
- Reinforced concrete beams, columns and floor slabs. Including cutting into them to run services.
- The household shelter. The walls, floor, ceiling and door of the shelter cannot be hacked, drilled into, or altered in any way. Nothing may be fixed to them.
- Anything that affects a neighbouring unit. Party walls and shared structures are common property.
The household shelter catches people out most often, because from inside the flat it looks like an ordinary store room. It is not. It is a civil defence structure, and the restriction covers even hanging a shelf on its wall.
Structural and non-structural walls
Non-structural walls, typically lightweight partitions or non-load-bearing blockwork, can usually be hacked with approval. Structural walls cannot, under any circumstances.
Telling them apart by eye is unreliable. A common piece of folk advice is to tap the wall and listen for a hollow sound, which is weak evidence at best and has led plenty of people to hack something they should not have. The reliable method is the flat's structural plan, which marks reinforced concrete walls explicitly. HDB can provide the plan for your flat, and a registered contractor will read it before quoting.
Older flats generally have more non-structural partitions than newer ones. Many recent BTO layouts use reinforced concrete more extensively, which means less can be altered. Do not assume that because a neighbour in a different block removed a wall, the same wall in your flat can go.
When a Professional Engineer endorsement is needed
Where proposed works come close to or affect structural elements, HDB requires the application to be endorsed by a Professional Engineer. The PE assesses the proposal and confirms the structure will not be compromised.
This applies to situations such as forming an opening near a structural wall, or works where the loading on a slab changes. HDB indicates at application stage whether an endorsement is required. The PE charges separately for the assessment, and their availability affects the timeline, so it is worth establishing early whether your job needs one.
Permitted working hours
Noisy work, which includes hacking, demolition and heavy drilling, is restricted to weekdays. It is generally permitted from 9am to 5pm and is not allowed on Saturdays, Sundays or public holidays. Quieter renovation work has a wider window.
There is also a limit on how long the noisiest phase may run. HDB restricts demolition and the removal of wall and floor finishes to three consecutive days, and limits the number of powered hand tools in use at any one time. This is why a full strip-out is sequenced rather than done all at once, and why a contractor who promises to do everything in a weekend is describing something that is not permitted.
These hours are periodically revised. Confirm the current position before committing to a schedule, particularly if your plans depend on weekend access.
How the application works
The sequence is straightforward once a registered contractor is engaged:
- The contractor reviews the flat's structural plan against what you want done and identifies anything that will not be approved.
- Where a PE endorsement is required, that is arranged before submission.
- The contractor lodges the application with HDB, setting out the works and the affected areas.
- HDB reviews and may raise queries. Responding promptly avoids delay.
- The permit is issued, valid for a fixed period during which the approved works must be completed.
Processing times vary with the works applied for and whether an endorsement is involved. Apply early rather than late: the permit has to be in hand before work starts, and an approval that arrives after your contractor has been booked helps nobody.
Permit validity and extensions
A renovation permit is valid for a defined period from the date of issue. All approved works must be completed inside that window. If a job overruns, an extension must be applied for rather than simply continuing.
Plan the programme with some margin. Deliveries slip and access gets restricted, and a permit that expires mid-job creates a problem that is entirely avoidable.
Penalties for unauthorised work
Hacking without a permit, hacking something that would never have been approved, or working outside permitted hours can all result in enforcement action. HDB may impose a fine and can require the work to be reinstated at the flat owner's expense.
Reinstatement is usually far more expensive than the original work, because rebuilding a wall to a standard HDB will accept is harder than removing one. The liability sits with the flat owner, not the contractor who carried out the work.
There is a second consequence that surfaces later. Unauthorised alterations are picked up when the flat is sold or inspected, and resolving them at that point, under time pressure, is worse than doing it correctly at the outset.
How long approval takes, step by step
Permit approval usually takes about one to two weeks, and a month or more where a Professional Engineer endorsement is needed. Once approved, HDB expects the renovation to be completed within three months for a new flat and one month for an existing flat.
| Step | Typical time |
|---|---|
| Check the structural plan and confirm what can be hacked | Before design is finalised |
| PE endorsement, where required | Adds time; allow a month or more in total |
| Contractor submits the application; HDB notifies you by SMS on receipt | Same day |
| HDB review and approval | Usually one to two weeks |
| Complete the approved works | Within three months (new flat) or one month (existing flat) |
What the permit and PE endorsement cost
HDB's renovation guidance does not list a separate fee for the permit itself. In practice, contractors fold the application work into their quote, sometimes as a small admin line. If a quote shows a large "permit fee", ask what it covers.
A Professional Engineer endorsement, where HDB requires one, is a separate cost. Published market ranges put it at about S$800 to S$2,000, depending on the works. For how these fit into the overall budget, see the wall hacking cost guide.
Noisy works hours, in full
Noisy works, including hacking, drilling, tile cutting and wall demolition, are allowed only from 9am to 5pm on weekdays. They are not allowed on Saturdays, Sundays, public holidays, or the eve of major public holidays. Our article on HDB renovation hours explains how this shapes a programme.
Fines
Unauthorised renovation in an HDB flat can lead to a fine of up to S$5,000, on top of an order to reinstate the work at the owner's expense. Planning to remove a wall? Our partition wall removal page covers the process from wall check to making good.
Condominiums and private property
The HDB permit process applies to HDB flats. In a private condominium, approval comes from the MCST rather than HDB, and the requirements differ by development. Most managements require a renovation application, a refundable deposit, proof of contractor insurance and an agreed schedule before granting access.
Structural alterations in private property may also require approval from the Building and Construction Authority. The principle is the same in both cases: the structure is not yours to alter unilaterally, and permission comes before work, not after.
A short checklist before you start
- Confirm your contractor is listed in HDB's Directory of Renovation Contractors
- Obtain the flat's structural plan and identify which walls are reinforced concrete
- Establish whether a PE endorsement is required, early
- Have the permit in hand before any hacking begins
- Check the current permitted hours rather than assuming
- Note the permit expiry date and plan the programme inside it
- Tell your immediate neighbours before the noisy phase starts
The last one is not a rule, but it prevents more complaints than anything else on the list.