Kitchen Hacking and Dismantling in Singapore

Cabinets, countertops and wall openings handled in one visit, with disposal included.

Kitchen strip-out

Kitchen hacking covers removing cabinets, countertops, wall tiles, splashbacks and built-in appliances, and where the layout is changing, forming an opening into an adjacent space.

Cabinets and countertops

Base and wall units are usually removed in sections rather than broken up, which controls dust and makes the waste easier to sort. Countertops vary: laminate lifts readily, while stone and engineered surfaces are heavy and need handling in pieces.

Built-in appliances come out before the units around them. Gas appliances must be disconnected by a licensed gas service worker before removal, not by the hacking crew.

Wall tiles and splashbacks

Kitchen wall tiles are removed with their bedding. Where tiles have been fixed directly to plaster, some of the plaster usually comes with them and the wall needs making good before re-tiling.

Opening up the kitchen

Forming an opening between kitchen and living area is one of the most requested changes. Whether it is possible depends entirely on the wall between them: a non-structural partition can generally be opened with approval, while a reinforced concrete wall cannot be touched.

There is a second consideration beyond structure. Kitchens have fire safety requirements relating to separation from the rest of the flat, and an open arrangement may be subject to conditions. Establish this at design stage, before joinery is ordered.

Services

Kitchens carry water supply, drainage, electrical circuits and often a gas supply. Each needs identifying and isolating before removal begins. Gas in particular is not something to handle as part of a strip-out, and requires a licensed gas service worker.

Where the layout is changing, drainage constrains sink positions and the existing electrical provision constrains where appliances can go without new circuits.

Floor finishes

Kitchen floors often have a waterproofing membrane beneath the screed, as bathrooms do. The same care applies: work to the tile bed rather than through it, and inspect the membrane once tiles are off.

Approval and hours

Tile and screed removal needs a renovation permit, as does forming an opening. Noisy work is weekdays only, generally 9am to 5pm, with demolition and finish removal limited to three consecutive days.

For typical market prices across walls, floors, toilets, kitchens, ceilings and disposal, see our hacking price list.

Kitchen Hacking and Dismantling questions

Do I need HDB approval before hacking a wall?

add
Yes. All hacking of walls in an HDB flat, whether partial or complete, needs written approval from HDB before works begin. This is issued as a renovation permit. Works carried out without a permit can result in a fine and an order to reinstate the wall at your own cost. We apply for the permit on your behalf as part of the job.

Which walls in my flat can be hacked?

add
Non-structural walls can usually be hacked with approval. Structural walls, reinforced concrete walls, columns, beams and household shelters can never be hacked. In most HDB flats the walls around the household shelter and certain internal walls are structural. We confirm which is which from your floor plan before quoting, and flag anything that will not be approved.

What hours can hacking works be carried out?

add
Noisy works such as hacking and heavy drilling are restricted to weekdays, generally 9am to 5pm. They are not permitted on Saturdays, Sundays or public holidays. Quieter renovation work has a wider window. We schedule hacking inside the permitted hours and plan low-noise tasks around them so the job still finishes on time. Check the current hours with HDB or your building management before fixing dates, as the rules are periodically updated.

How long do hacking works usually take?

add
A single wall opening in an HDB flat is often a one-day job. A full flat strip-out including floor tiles, bathroom and kitchen typically runs three to five working days. Commercial reinstatement depends on floor area and what has to come out, and we give you a day-by-day programme with the quotation.

Do you clear the debris afterwards?

add
Yes. Debris removal and disposal at licensed facilities is included in our scope unless stated otherwise. We sort waste on site where required, protect common corridors and lifts during removal, and leave the unit swept clean at the end of works.

Get a site survey for your hacking works

Send us your floor plan or a few photos and we will advise what can be hacked, what needs a permit, and how long the works will take.