Hoarding Contractor in Singapore: Mall and Retail Hoarding
Hoarding installed around retail units in malls during fit-out and reinstatement, built to mall requirements and removed cleanly at the end.
As a hoarding contractor in Singapore, we install hoarding around retail units in shopping malls while the unit is being fitted out or reinstated. The hoarding screens the works from shoppers, contains dust and noise, and gives the mall a clean frontage to put graphics on. It has to meet the mall's specification, go up without disrupting the walkway, and come down cleanly at the end.
Hoarding types
Most mall hoarding is metal stud framing with board, finished to a smooth surface. The detail depends on the mall and the length of the works.
- Full-height board hoarding on metal studs, jointed and skim-coated for paint or printed graphics. The most common type for retail fit-out and reinstatement.
- Hoarding with access doors, lockable, for workers and deliveries, positioned to suit the mall's service routes.
- Short-term screens for brief works, where the mall allows lighter construction.
Outdoor construction-site hoarding for building projects is a different category, with its own requirements, and is not what this page covers.
Mall requirements
Every mall sets its own rules, and approval comes before any hoarding goes up.
Typical requirements include drawings showing the hoarding line and height, materials that meet fire safety requirements, a finish standard for the face seen by shoppers, approved working hours (usually after the mall closes), protection of the walkway floor and adjoining shopfronts, and insurance documents. Some malls also specify the graphics or colour. We obtain the specification from the mall, prepare the submission, and build to it.
During the works
Hoarding has to look right for the whole job, not just on the day it goes up.
Shoppers walk past it every day, so it is kept clean, intact and secure throughout. Damage from trolleys, deliveries or the works behind it is repaired promptly. The access door is kept locked outside working hours. If the mall carries out its own inspections, we fix anything raised quickly so the unit stays in good standing with management.
Timeline
A typical retail unit hoarding is installed over a few nights after mall closing hours, once the mall has approved the submission.
- Mall approval: varies by mall, so submit early.
- Installation: typically a few nights for a standard shopfront.
- Finishing: jointing and skim coat, then paint or graphics.
- Removal: usually one night at the end of works.
Projects
In a recent mall hoarding project, we set out and erected metal stud framing along a mall walkway, fixed the hoarding boards, and taped, filled and skimmed all joints to a smooth finish. The tiled walkway and glass balustrade were protected throughout, access was coordinated with mall management, and the unit stayed screened from shoppers for the whole job. The installation took five days.
Removal and making good
When the works are done, the hoarding comes down cleanly and the walkway is left as it was found.
Boards and framing are dismantled and removed through the mall's service routes, fixings are taken out of the floor and ceiling, and any marks are cleaned or made good. Walkway protection comes up last, once the debris is gone. Mall management usually inspects the area before the unit opens.
Hoarding with reinstatement
Hoarding often goes up for a reinstatement rather than a new fit-out, at the end of a retail lease. We can install the hoarding and carry out the reinstatement behind it, so the mall deals with one contractor from start to finish. See shop and retail reinstatement.
What we need to quote
A hoarding quote is quick to prepare once we know the basics.
- The mall name and unit number
- The length and height of the shopfront to be hoarded
- The mall's hoarding specification, if you already have it
- The start date and expected length of the works
- Whether you need an access door, and where
- Whether graphics will be applied, and who is supplying them
Request a hoarding quote with the mall name, unit size and works dates.
How we carry out the works
-
1
Mall requirements
Obtain the mall's hoarding specification, drawings requirements, working hours and approval process.
-
2
Submission
Submit drawings, method statement and insurance documents for mall approval.
-
3
Set out and frame
Set out the line and erect metal stud framing, protecting the walkway and adjoining finishes.
-
4
Board and finish
Fix hoarding boards, tape and skim the joints, and finish ready for graphics or paint.
-
5
Removal
Dismantle the hoarding at the end of works and make good the walkway.
check_circle What is included
- check Mall submissions
- check Metal stud framing
- check Hoarding boards, jointing and skim finish
- check Protection of walkway and adjoining finishes
- check Removal and disposal at the end of works
cancel Not included
- remove Printed graphics and branding
- remove Lighting on the hoarding
- remove Fire protection modifications