Skip to content
foundation Wall Hacking.sg
Interior strip-out in progress with floor tiles removed and plywood wall protection in place

Hacking Contractor for Wall Hacking and Reinstatement in Singapore

Hacking works for HDB, BTO, condo and commercial spaces. Clean, compliant and completed on schedule.

  • description HDB permit applications handled
  • delete_sweep Debris cleared and disposed
  • schedule Works within approved hours
  • shield Common areas protected

How the works run

Most hacking jobs follow the same four stages. Knowing what happens when makes it easier to plan the rest of your renovation around it.

  1. 1 search

    Site survey

    We visit the unit or review your floor plan and photos, and confirm which walls and finishes can be removed.

  2. 2 description

    Permit application

    We prepare and submit the HDB renovation permit or MCST application, including a PE endorsement where one is needed.

  3. 3 construction

    Hacking works

    Work areas are screened, common corridors and lifts protected, and hacking carried out within approved hours.

  4. 4 cleaning_services

    Clearance and handover

    Debris is sorted, removed and disposed of at licensed facilities, and the unit is left swept clean.

Common questions about hacking works

Do I need HDB approval before hacking a wall?

add
Yes. All hacking of walls in an HDB flat, whether partial or complete, needs written approval from HDB before works begin. This is issued as a renovation permit. Works carried out without a permit can result in a fine and an order to reinstate the wall at your own cost. We apply for the permit on your behalf as part of the job.

Which walls in my flat can be hacked?

add
Non-structural walls can usually be hacked with approval. Structural walls, reinforced concrete walls, columns, beams and household shelters can never be hacked. In most HDB flats the walls around the household shelter and certain internal walls are structural. We confirm which is which from your floor plan before quoting, and flag anything that will not be approved.

What hours can hacking works be carried out?

add
Noisy works such as hacking and heavy drilling are restricted to weekdays, generally 9am to 5pm. They are not permitted on Saturdays, Sundays or public holidays. Quieter renovation work has a wider window. We schedule hacking inside the permitted hours and plan low-noise tasks around them so the job still finishes on time. Check the current hours with HDB or your building management before fixing dates, as the rules are periodically updated.

How long do hacking works usually take?

add
A single wall opening in an HDB flat is often a one-day job. A full flat strip-out including floor tiles, bathroom and kitchen typically runs three to five working days. Commercial reinstatement depends on floor area and what has to come out, and we give you a day-by-day programme with the quotation.

Do you clear the debris afterwards?

add
Yes. Debris removal and disposal at licensed facilities is included in our scope unless stated otherwise. We sort waste on site where required, protect common corridors and lifts during removal, and leave the unit swept clean at the end of works.

Do you work with interior designers and renovation contractors?

add
Regularly. We are often engaged directly by interior design firms and main contractors to handle the hacking and disposal phase before their own works begin. We can work to your programme and coordinate access with the other trades on site.

Which areas of Singapore do you cover?

add
We cover all of Singapore, including HDB estates, private condominiums, landed properties and commercial premises across the island.

Get a site survey for your hacking works

Send us your floor plan or a few photos and we will advise what can be hacked, what needs a permit, and how long the works will take.