
delete_sweep Hacking Services
Dismantling and Disposal Services in Singapore
Built-ins stripped out and debris cleared, sorted and disposed of at licensed facilities.
Dismantling and clearance
Dismantling covers the removal of built-in carpentry, fixtures, fittings and non-structural installations, along with sorting, removing and disposing of the resulting waste.
What is typically removed
- Built-in wardrobes, shelving and storage
- Kitchen cabinets and countertops
- Feature wall panelling and cladding
- Suspended ceilings and bulkheads
- Sanitary ware and bathroom fittings
- Floor and wall finishes
- Non-structural partitions, with approval
Dismantling rather than demolition
Carpentry taken apart in sections produces less dust, is quieter, and generates waste that can be sorted. Breaking the same item up is faster on the day and worse in every other respect, including the time spent clearing afterwards.
It also matters for anything being retained. An item removed carefully can be reinstalled; an item broken out cannot.
Protecting what stays
Most strip-outs retain something: a floor, a ceiling, a wall finish, or an appliance. Protection goes in before tools arrive, typically sheeting on retained floors and board protection on walls along the access route.
In a condominium this extends to common property. Lift interiors, lobbies and corridors are usually protected as a condition of access, and inspected before the deposit is returned.
Waste sorting and disposal
Renovation waste separates broadly into inert material such as tile, concrete and screed, timber and board from carpentry, metal, and general waste. Sorting on site makes disposal more straightforward and is required by some facilities.
Waste is disposed of at licensed facilities. In HDB blocks and condominiums, the removal route and timing are usually set by the building, often with debris removal restricted to specific hours.
Volume
Strip-out waste is bulkier than people expect. A single fitted wardrobe fills more bags than it appears to from the outside, and tile and screed are heavy for their volume. This affects how many trips are needed and how long the clearance phase takes.
Working hours
Where dismantling involves noisy work it falls under the weekday restriction, generally 9am to 5pm. Quieter removal has a wider window, but building-specific rules on debris removal times apply regardless.
For typical market prices across walls, floors, toilets, kitchens, ceilings and disposal, see our hacking price list.