Dismantling and Disposal Services in Singapore

Built-ins stripped out and debris cleared, sorted and disposed of at licensed facilities.

Dismantling and clearance

Dismantling covers the removal of built-in carpentry, fixtures, fittings and non-structural installations, along with sorting, removing and disposing of the resulting waste.

What is typically removed

  • Built-in wardrobes, shelving and storage
  • Kitchen cabinets and countertops
  • Feature wall panelling and cladding
  • Suspended ceilings and bulkheads
  • Sanitary ware and bathroom fittings
  • Floor and wall finishes
  • Non-structural partitions, with approval

Dismantling rather than demolition

Carpentry taken apart in sections produces less dust, is quieter, and generates waste that can be sorted. Breaking the same item up is faster on the day and worse in every other respect, including the time spent clearing afterwards.

It also matters for anything being retained. An item removed carefully can be reinstalled; an item broken out cannot.

Protecting what stays

Most strip-outs retain something: a floor, a ceiling, a wall finish, or an appliance. Protection goes in before tools arrive, typically sheeting on retained floors and board protection on walls along the access route.

In a condominium this extends to common property. Lift interiors, lobbies and corridors are usually protected as a condition of access, and inspected before the deposit is returned.

Waste sorting and disposal

Renovation waste separates broadly into inert material such as tile, concrete and screed, timber and board from carpentry, metal, and general waste. Sorting on site makes disposal more straightforward and is required by some facilities.

Waste is disposed of at licensed facilities. In HDB blocks and condominiums, the removal route and timing are usually set by the building, often with debris removal restricted to specific hours.

Volume

Strip-out waste is bulkier than people expect. A single fitted wardrobe fills more bags than it appears to from the outside, and tile and screed are heavy for their volume. This affects how many trips are needed and how long the clearance phase takes.

Working hours

Where dismantling involves noisy work it falls under the weekday restriction, generally 9am to 5pm. Quieter removal has a wider window, but building-specific rules on debris removal times apply regardless.

For typical market prices across walls, floors, toilets, kitchens, ceilings and disposal, see our hacking price list.

Related projects

Dismantling and Disposal questions

Do I need HDB approval before hacking a wall?

add
Yes. All hacking of walls in an HDB flat, whether partial or complete, needs written approval from HDB before works begin. This is issued as a renovation permit. Works carried out without a permit can result in a fine and an order to reinstate the wall at your own cost. We apply for the permit on your behalf as part of the job.

Which walls in my flat can be hacked?

add
Non-structural walls can usually be hacked with approval. Structural walls, reinforced concrete walls, columns, beams and household shelters can never be hacked. In most HDB flats the walls around the household shelter and certain internal walls are structural. We confirm which is which from your floor plan before quoting, and flag anything that will not be approved.

What hours can hacking works be carried out?

add
Noisy works such as hacking and heavy drilling are restricted to weekdays, generally 9am to 5pm. They are not permitted on Saturdays, Sundays or public holidays. Quieter renovation work has a wider window. We schedule hacking inside the permitted hours and plan low-noise tasks around them so the job still finishes on time. Check the current hours with HDB or your building management before fixing dates, as the rules are periodically updated.

How long do hacking works usually take?

add
A single wall opening in an HDB flat is often a one-day job. A full flat strip-out including floor tiles, bathroom and kitchen typically runs three to five working days. Commercial reinstatement depends on floor area and what has to come out, and we give you a day-by-day programme with the quotation.

Do you clear the debris afterwards?

add
Yes. Debris removal and disposal at licensed facilities is included in our scope unless stated otherwise. We sort waste on site where required, protect common corridors and lifts during removal, and leave the unit swept clean at the end of works.

Get a site survey for your hacking works

Send us your floor plan or a few photos and we will advise what can be hacked, what needs a permit, and how long the works will take.