Skip to content
foundation Wall Hacking.sg

grid_on Hacking Services

Floor Hacking and Tile Removal in Singapore

Tile, screed and floor finish removal with dust screening and same-day debris clearance.

Removing floor finishes

Floor hacking covers the removal of tiles, screed, vinyl, parquet and other finishes down to a sound substrate ready for new work. It is one of the dustiest jobs in a renovation and one where what sits beneath the finish matters more than the finish itself.

A permit is required

Removing floor tiles and screed in an HDB flat needs a renovation permit. There are also limits on how much screed may be removed, because the screed contributes to floor loading and, in wet areas, sits above the waterproofing.

Those limits vary by flat type and by area within the flat. They should be checked against your specific flat rather than assumed.

The waterproofing membrane

In bathrooms, service yards and kitchens, a waterproofing membrane sits below the screed. Hacking through to the slab breaches it.

Once breached, the membrane must be reinstated and tested before new finishes go down. If it is not, water migrates through the slab and appears as staining on the ceiling of the unit below. This is the most common cause of post-renovation disputes between neighbours, and it is entirely preventable.

The approach that avoids it is working to the tile bed rather than through it wherever possible, and inspecting the membrane once the tiles are off. If it has been disturbed, that should be reported rather than covered over.

Different finishes, different work

  • Ceramic and homogeneous tiles. Removed with the bedding beneath. The bedding usually takes longer than the tiles.
  • Vinyl and laminate. Faster to lift, but adhesive residue often needs mechanical removal.
  • Parquet. Lifts in sections, with adhesive remaining on the screed.
  • Screed. The slowest element, and where the permitted removal limits apply.

Dust

Floor hacking produces fine dust that travels. Control measures include screening the work area with sheeting, sealing doorways to rooms not being worked on, and using extraction on cutting equipment.

Even with control, some dust escapes. Soft furnishings should be removed and anything remaining in the unit covered. In an occupied flat, this is the phase worth being elsewhere for.

Debris

Tile and screed debris is heavy and bulky. It is bagged on site, moved through protected common areas, and disposed of at licensed facilities. In condominiums the removal route and timing are usually set by building management.

Working hours

Floor hacking is noisy work: weekdays only, generally 9am to 5pm, not Saturdays, Sundays or public holidays. HDB also limits finish removal to three consecutive days, which means a large area is sequenced rather than done in one continuous push.

Floor hacking cost

Published market ranges put floor tile hacking at about S$3 to S$8 per square foot, and screeding afterwards at about S$1 to S$3 per square foot. When the existing floor is sound, an overlay can avoid hacking entirely. Our article on floor hacking cost: hack or overlay compares the options with a worked example for a 700 sq ft flat.

For typical market prices across walls, floors, toilets, kitchens, ceilings and disposal, see our hacking price list.

Floor and Tile Hacking questions

Does floor tile hacking need an HDB permit?

add
Removing floor tiles and screed in an HDB flat generally requires a renovation permit, and there are limits on how much screed may be removed because of the loading and waterproofing beneath. We check the specific limits for your flat type and include the permit in our scope.

Can tiles be removed without damaging the waterproofing?

add
In bathrooms and service yards the waterproofing membrane sits below the screed, and careless hacking will breach it. We work to the tile bed rather than through it wherever possible, and if the membrane is disturbed we tell you so it can be redone before new finishes go down.

How is dust controlled during floor hacking?

add
We screen off the work area with sheeting, seal doorways to rooms not being worked on, and use dust extraction on cutting equipment. Floor hacking still produces fine dust, so we recommend removing soft furnishings and covering anything left in the unit.

Get a site survey for your hacking works

Send us your floor plan or a few photos and we will advise what can be hacked, what needs a permit, and how long the works will take.