Skip to content
foundation Wall Hacking.sg

event_available Reinstatement Services

End of Lease Reinstatement in Singapore

Works planned backwards from your handover date so the unit is ready on time.

Reinstatement before lease handover

End of lease reinstatement is the same physical work as any other strip-out, organised around a fixed date that cannot move. The lease end determines the programme, and everything else is planned backwards from it.

What the lease requires

The reinstatement obligation sits in the tenancy agreement. Read the clause carefully, because the wording varies more than people expect. Common variations include:

  • Return to the condition at commencement, fair wear and tear excepted
  • Return to bare shell, regardless of the condition at commencement
  • Removal of tenant alterations only, with approved works permitted to remain
  • Landlord's option to require either reinstatement or a payment in lieu

These produce materially different scopes and costs. Establishing which applies is the first task, ahead of any site work.

The dilapidation record

A schedule of condition from the start of the tenancy, with photographs, is the document that defines what "original condition" means. It is what prevents the scope from expanding during final inspection.

If it exists, find it. If it does not, that is worth knowing early, because the discussion with the landlord will be different and it is better to have that conversation with time in hand.

Planning backwards from the date

A workable sequence, working back from lease end:

  1. Handover inspection with the landlord or their surveyor
  2. Final clean and snagging after works complete
  3. Making good to walls, floors and ceilings
  4. Strip-out of the fit-out
  5. Isolation of services and any specialist disconnections
  6. Building approvals, permit to work, insurance and access passes
  7. Scope agreement with the landlord, against the dilapidation record

The approvals step is routinely underestimated. In a managed building it can take longer than some of the physical work.

Agreeing scope with the landlord in advance

Where possible, agree the reinstatement scope in writing before starting. This avoids the situation where work is completed, the landlord inspects, and additional items are raised with no time left to address them.

It also identifies anything the landlord would prefer retained, which removes work rather than adding it.

If the date is missed

Most leases allow the landlord to charge holding-over rent for the period the unit remains unavailable, or to carry out the reinstatement themselves and recover the cost. Neither is an appealing outcome, and both are more expensive than allowing adequate time at the start.

After-hours working

Where the building is occupied, noisy work is usually restricted to evenings and weekends. This lengthens the programme and needs building into the plan from the beginning rather than discovered once work has started.

For typical market rates per square foot and worked budgets, see our reinstatement cost guide.

End of Lease Reinstatement questions

What is a dilapidation check?

add
A comparison between the current state of the unit and its condition when the lease began, usually recorded in a handover report with photographs. It establishes what you are actually required to reinstate. Without it, landlords sometimes ask for more than the lease obliges.

What happens if reinstatement is not finished by the lease end date?

add
Most leases allow the landlord to charge holding-over rent until the unit is handed back, or to carry out the works themselves and bill the tenant. Both are more expensive than planning the programme properly, which is why we work backwards from your handover date.

Get a site survey for your hacking works