Skip to content
foundation Wall Hacking.sg

construction Hacking Services

Demolition Works in Singapore: Interior Strip-Out and Partial Demolition

Interior strip-out and partial demolition for homes, offices, shops and industrial units, with protection, approvals and licensed disposal handled.

Demolition works in Singapore, for most homes and businesses, means interior demolition: stripping out a flat, office, shop or industrial unit down to its shell, or removing selected parts such as partitions, ceilings, floors and fittings. As a demolition contractor for interior strip-out and partial demolition, we plan the sequence, protect what stays, handle the approvals, and take every load of debris to a licensed facility.

What we demolish

We carry out interior and partial demolition across residential, commercial and industrial premises.

  • Residential. HDB flats, condominiums and landed homes being stripped for a full renovation: walls, floors, ceilings, kitchens, bathrooms and built-in carpentry.
  • Commercial. Offices, shops, F&B units and clinics being returned to shell, or cleared for a new fit-out. Partitions, ceilings, raised floors, shopfronts and joinery.
  • Industrial. Factory and warehouse units with mezzanines, internal offices, partitions and fittings to remove at the end of a lease.

Whole-building demolition is a different class of project, with its own BCA approvals and specialist plant. If that is what you need, tell us at the outset and we will say plainly whether it falls within our scope.

Hacking vs demolition: which you need

Hacking removes specific elements while the rest of the space stays; demolition, in the interior sense, clears most or all of it.

If you are changing a layout in a flat that will otherwise stay as it is, you need hacking: one wall, a set of floor tiles, a bathroom. If you are taking a unit back to bare shell before a new fit-out or a lease handover, you need strip-out or interior demolition. The tools overlap; the planning, protection and disposal volumes do not. Our article on hacking vs demolition goes through the difference with examples.

Strip-out before a renovation vs strip-out for handover

The same strip-out has a different end point depending on what happens next.

Before a renovation, the goal is a clean, safe shell for the next trades. Anything that will be replaced comes out, services are capped and made safe, and the floors and walls are left ready for the new work. Some items, such as windows, doors or a good floor, may be kept and protected.

For a lease handover, the goal is the condition the lease requires, which is set by the reinstatement clause and the original handover record. Here the strip-out is only part of the job: the space may also need a building-standard ceiling, repainting and certification of M&E changes. Our end of lease reinstatement service covers that full scope.

Knowing which applies before the survey keeps the quote accurate and avoids removing things you will need to put back.

Working in occupied and live buildings

Most interior demolition happens in buildings that stay in use, which shapes how the work is done.

  • Neighbours stay at home. In HDB blocks and condominiums, noise and dust carry. Noisy works are kept to permitted hours, and dust screens and sealed debris bags limit what escapes the unit.
  • Shoppers and office workers keep moving. In malls and office towers, noisy work often happens after hours, debris goes out through the loading bay, and common areas are protected and inspected.
  • Lifts are shared. Lift protection is installed before the first load, and debris is moved in the slots the building allows.
  • The building is still live. Fire alarms, sprinklers and shared services are coordinated with building management, never switched off on our own initiative.

Safety and compliance

Demolition is controlled work. The rules that matter most are about structure, disposal, and the building's own conditions.

  • Structure. Only non-structural elements are removed. Load-bearing walls, columns, beams and slabs are identified from the plans before work starts and left untouched.
  • Services. Electrical circuits, water and gas are isolated and made safe before anything is removed near them.
  • Disposal. Construction waste must go to NEA-licensed disposal facilities. Illegal dumping is enforced against, and responsibility does not end when the lorry leaves your site.
  • Building rules. Condominiums need MCST approval, and many set deposits, removal hours and lift restrictions. Malls and office towers commonly require method statements, insurance documents and after-hours noisy works.
  • HDB flats. Hacking needs HDB approval, a contractor listed in HDB's Directory of Renovation Contractors, and noisy works only from 9am to 5pm on weekdays.

Projects

Recent strip-out work includes an HDB flat strip-out where built-in wardrobes, feature panelling and floor tiles were removed from an occupied flat over six days, and an F&B unit strip-out returned for lease handover in four days with the glazed frontage protected throughout. See the full portfolio for more.

What a strip-out leaves behind

A good strip-out leaves a site that the next trade can start on straight away.

That means debris fully cleared, floors swept, capped services labelled, and any surprises found during the work recorded. Strip-outs often uncover things that were hidden: old water damage under tiles, cracked screed, wiring that does not match the drawings, or an earlier renovation's shortcuts. We photograph and report these at handover, so your designer or contractor can plan for them rather than discover them later.

Pricing approach

We price demolition against a written scope after a site survey, not per square foot alone.

Floor area is a starting point, but the real drivers are what is being removed, how heavy it is, how it leaves the building, and when work is allowed. Disposal is a significant line on any demolition job: published market ranges for haulage and debris clearance are about S$500 to S$1,500 per job, and about S$300 to S$500 for a single small-lorry trip including labour and compliant disposal. A large strip-out needs several trips.

Every quote lists what is included and excluded, so you can compare it fairly. For other job types, see our hacking price list. Our dismantling and disposal service covers smaller removal jobs.

Request a demolition quote with photos and a floor plan.

How we carry out the works

  1. 1

    Site survey

    We walk the premises, confirm what is to be removed and what stays, and check access, loading and building rules.

  2. 2

    Approvals

    HDB permit, MCST application or building management approval prepared and submitted before work starts.

  3. 3

    Protection

    Retained floors, walls, glazing and fittings are protected, along with lifts and corridors on the removal route.

  4. 4

    Strip-out and demolition

    Fittings dismantled first, then finishes, partitions and other non-structural elements removed in sequence.

  5. 5

    Disposal and handover

    Debris sorted, removed through the permitted route and taken to licensed facilities. The site is swept clean for the next trade.

check_circle What is included

  • check Site survey and written scope
  • check Permit or management applications
  • check Protection of retained areas and common property
  • check Dismantling and demolition of agreed elements
  • check Debris sorting, haulage and licensed disposal
  • check Clean site at handover

cancel Not included

  • remove Structural demolition of load-bearing elements
  • remove Whole-building demolition
  • remove New finishes and fit-out
  • remove Electrical and plumbing reconnection

Demolition Works questions

Do you demolish whole buildings?

add
Our work is interior strip-out and partial demolition of non-structural elements. Whole-building demolition needs separate BCA approvals and specialist plant. Tell us what you need and we will say plainly whether it is within our scope.

Do you handle debris disposal?

add
Yes. Debris is sorted on site, removed through the route and hours the building allows, and taken to NEA-licensed disposal facilities. Disposal is listed in every quote so you can see what is covered.

Is interior demolition the same as hacking?

add
They overlap. Hacking removes specific elements while the rest of the space stays, such as one wall or a set of floor tiles. Interior demolition or strip-out clears most or all of a space, usually back to shell.

Do I need approval for interior demolition?

add
Usually. HDB flats need an HDB permit for hacking works, condominiums need MCST approval, and commercial buildings need building management approval. We prepare and submit these before work starts.

Get a site survey for your hacking works

Send us your floor plan or a few photos and we will advise what can be hacked, what needs a permit, and how long the works will take.