Skip to content
foundation Wall Hacking.sg

restaurant Reinstatement Services

F&B and Restaurant Reinstatement in Singapore

Kitchens, exhaust systems and grease traps removed and the unit returned to bare shell.

F&B unit reinstatement

Reinstating a restaurant, cafe or food outlet is more involved than a comparable retail unit, because of the kitchen. Extraction, grease, gas and drainage all need handling properly, and several elements require competent persons rather than general strip-out labour.

Kitchen equipment

Cooking equipment, refrigeration, cold rooms, prep counters and stainless steel fabrications generally come out as part of reinstatement. Refrigeration containing refrigerant must have it recovered by a competent person before disconnection.

Gas appliances must be disconnected by a licensed gas service worker, and the supply capped off properly. This is not work for a strip-out crew, and it needs scheduling as a separate item.

Exhaust and ventilation

Kitchen exhaust systems are usually the largest single element. Canopies, ductwork, fans and any filtration or scrubber units all have to be removed, and the ductwork is typically coated internally with grease.

Grease-laden ductwork is heavy, awkward, and a fire risk during removal. It needs degreasing before hot work of any kind, and the sections have to be handled so residue does not end up on the floor or in the corridor.

Where ductwork passes through a riser or discharges at roof level, removal usually needs building management coordination and access arrangements well beyond the unit itself.

Grease traps and drainage

Grease traps must be emptied and cleaned before removal, and their contents disposed of appropriately rather than into the drainage system. Floor gullies, channel drains and any tenant-installed drainage connections generally also form part of the scope.

Where drainage was modified during fit-out, reinstating the original arrangement may be required by the lease.

Floor and wall finishes

F&B kitchens use heavy-duty finishes: epoxy or resin floors laid with a fall to drainage, coved skirtings, and wall cladding or large-format tiling. These are substantially harder to remove than domestic finishes, and the screed beneath often has a built-in fall that has to be addressed.

Waterproofing beneath kitchen floors needs the same care as a bathroom. Breaching it affects the unit below.

Pest and hygiene

Kitchens that have been trading accumulate grease and food residue in places that only become visible during strip-out, particularly behind equipment and beneath floor finishes. Cleaning is generally part of handover rather than an optional extra.

Programme

F&B reinstatement involves more separate trades than most: gas, refrigeration, ductwork, drainage and general strip-out. Sequencing those around a mall's after-hours access window is what drives the programme, so it is worth starting the planning early.

For typical market rates per square foot and worked budgets, see our reinstatement cost guide.

Related projects

F&B and Restaurant Reinstatement questions

Do I need HDB approval before hacking a wall?

add
Yes. All hacking of walls in an HDB flat, whether partial or complete, needs written approval from HDB before works begin. This is issued as a renovation permit. Works carried out without a permit can result in a fine and an order to reinstate the wall at your own cost. We apply for the permit on your behalf as part of the job.

Which walls in my flat can be hacked?

add
Non-structural walls can usually be hacked with approval. Structural walls, reinforced concrete walls, columns, beams and household shelters can never be hacked. In most HDB flats the walls around the household shelter and certain internal walls are structural. We confirm which is which from your floor plan before quoting, and flag anything that will not be approved.

What hours can hacking works be carried out?

add
Noisy works such as hacking and heavy drilling are restricted to weekdays, generally 9am to 5pm. They are not permitted on Saturdays, Sundays or public holidays. Quieter renovation work has a wider window. We schedule hacking inside the permitted hours and plan low-noise tasks around them so the job still finishes on time. Check the current hours with HDB or your building management before fixing dates, as the rules are periodically updated.

How long do hacking works usually take?

add
A single wall opening in an HDB flat is often a one-day job. A full flat strip-out including floor tiles, bathroom and kitchen typically runs three to five working days. Commercial reinstatement depends on floor area and what has to come out, and we give you a day-by-day programme with the quotation.

Do you clear the debris afterwards?

add
Yes. Debris removal and disposal at licensed facilities is included in our scope unless stated otherwise. We sort waste on site where required, protect common corridors and lifts during removal, and leave the unit swept clean at the end of works.

Get a site survey for your hacking works

Send us your floor plan or a few photos and we will advise what can be hacked, what needs a permit, and how long the works will take.