BTO Hacking Services in Singapore

Early-stage hacking for new flats, scheduled around your renovation timeline.

Hacking works in a new BTO flat

New BTO flats are handed over in a defined condition, and many owners want changes before moving in. Doing the hacking before the rest of the renovation starts is the sensible sequence: the flat is empty, access is unrestricted, and the dust phase is over before finishes arrive.

What owners usually change

  • Forming an opening between the kitchen and living area
  • Removing a bedroom partition to enlarge a room
  • Taking out bathroom or kitchen wall tiles before re-tiling
  • Removing floor finishes where a different material is planned

All of these need a renovation permit, and all are subject to the same structural constraints as any other flat.

Newer flats have less scope

BTO layouts often use reinforced concrete more extensively than older HDB designs. That means fewer walls are candidates for removal, and a layout change that works in a resale flat may not be possible in a new one.

This catches people out when they have seen a renovation of an older flat and assumed the same is achievable. Check the structural plan for your specific flat before committing to a design or ordering joinery.

The household shelter

Every BTO flat has a household shelter, and it cannot be altered in any way. Its walls, floor, ceiling and door are protected, and nothing may be fixed to them.

It is usually positioned where it is structurally required rather than where it is convenient, and it is a fixed point that the rest of the layout has to work around.

Defects liability and hacking

New flats come with a defects liability period during which HDB will rectify defects. Alterations you make are not defects, and hacking a wall may affect how a related issue is assessed.

If you have outstanding defect reports, it is worth having those resolved before altering the surrounding area, so there is no question about what caused what.

Sequencing

Hacking first, then services, then finishes. Running it in that order means the noisy and dusty phase happens in an empty flat, and there is no risk of damaging newly installed work.

The permitted-hours restriction applies in full: weekdays only, generally 9am to 5pm, with demolition and finish removal limited to three consecutive days.

For typical market prices across walls, floors, toilets, kitchens, ceilings and disposal, see our hacking price list. For walls specifically, see the wall hacking cost guide.

BTO Hacking Services questions

Do I need HDB approval before hacking a wall?

add
Yes. All hacking of walls in an HDB flat, whether partial or complete, needs written approval from HDB before works begin. This is issued as a renovation permit. Works carried out without a permit can result in a fine and an order to reinstate the wall at your own cost. We apply for the permit on your behalf as part of the job.

Which walls in my flat can be hacked?

add
Non-structural walls can usually be hacked with approval. Structural walls, reinforced concrete walls, columns, beams and household shelters can never be hacked. In most HDB flats the walls around the household shelter and certain internal walls are structural. We confirm which is which from your floor plan before quoting, and flag anything that will not be approved.

What hours can hacking works be carried out?

add
Noisy works such as hacking and heavy drilling are restricted to weekdays, generally 9am to 5pm. They are not permitted on Saturdays, Sundays or public holidays. Quieter renovation work has a wider window. We schedule hacking inside the permitted hours and plan low-noise tasks around them so the job still finishes on time. Check the current hours with HDB or your building management before fixing dates, as the rules are periodically updated.

How long do hacking works usually take?

add
A single wall opening in an HDB flat is often a one-day job. A full flat strip-out including floor tiles, bathroom and kitchen typically runs three to five working days. Commercial reinstatement depends on floor area and what has to come out, and we give you a day-by-day programme with the quotation.

Do you clear the debris afterwards?

add
Yes. Debris removal and disposal at licensed facilities is included in our scope unless stated otherwise. We sort waste on site where required, protect common corridors and lifts during removal, and leave the unit swept clean at the end of works.

Get a site survey for your hacking works

Send us your floor plan or a few photos and we will advise what can be hacked, what needs a permit, and how long the works will take.