Skip to content
foundation Wall Hacking.sg

meeting_room Reinstatement Services

Glass and Drywall Partition Removal for Offices in Singapore

Glass, drywall and demountable partitions removed from offices, with after-hours work, building approvals and making good.

Glass partition removal in Singapore offices is a dismantling job, not demolition. Framed and frameless glass, drywall and demountable partitions have to come out cleanly, usually after hours, without damaging the ceiling, carpet or the building's common areas. We remove office partitions for lease-end reinstatement, layout changes and new fit-outs, and make good the floor and ceiling where they stood.

What we remove

All common office partition types, along with the doors and fittings attached to them:

  • Glass partitions, framed and frameless, including glass doors, manifestation film and door hardware
  • Drywall partitions, board on metal studs, including any insulation and acoustic infill
  • Demountable partition systems, dismantled in their modules
  • Doors and frames, access control hardware and door closers
  • Fittings on partitions, such as whiteboards, shelving, power and data points

For brick and blockwork partitions in homes, see partition wall removal.

After-hours work in office buildings

Most Singapore office buildings restrict noisy works to nights and weekends, so partition removal is usually scheduled after hours.

Building management typically asks for a work permit, a method statement, insurance certificates and the names of workers before granting access. Loading bay and service lift slots are booked in advance, and protection of lift lobbies and corridors is inspected before and after the works. We handle these submissions and plan the work to fit the slots the building allows. After-hours labour carries a premium, which is worth factoring into a reinstatement budget.

Reinstatement or layout change

Partitions come out for two different reasons, and the scope differs.

At the end of a lease, removal is part of returning the office to its original condition, and the standard is set by the lease and the landlord's handover record. The floor and ceiling usually need to be returned to building standard, and the landlord's consultant may inspect the result.

For a layout change, only selected partitions come out and the office stays in use. Work is planned around the business, often over a weekend, and the space is left ready for the new fit-out. Less making good may be needed because new finishes are coming.

Glass handling and disposal

Glass panels are heavy, sharp when broken and awkward to move through a building, so they need a plan.

Panels are removed in the reverse order of installation, with suction lifters and enough hands to control each one. Panels being kept are protected and stored; panels for disposal are handled so they do not break in corridors or lifts. Glass is separated from metal frames and board for disposal at licensed facilities. Laminated and toughened glass break differently, which affects how they are handled.

Coordinating with other trades

Partitions often carry services that belong to other trades, so removal is coordinated rather than done in isolation.

  • Electrical and data. Power points, switches and data outlets in partitions are isolated by a licensed electrician before removal.
  • Access control. Card readers and magnetic locks on glass doors are disconnected by the security contractor.
  • Air-conditioning and fire protection. Enclosed rooms may have their own diffusers, sprinklers or detectors that need relocating once the walls are gone.

Making good after removal

Partitions are fixed into the floor and ceiling. Removing them leaves tracks, fixings and gaps that need making good.

Floor tracks are lifted and fixings removed, leaving a line in the carpet or floor finish that may need patching or replacement. At the ceiling, the head track is removed and damaged ceiling tiles noted for replacement to match the building standard. Power and data points in the partitions are isolated before removal; the cabling is then removed or made safe according to the reinstatement scope.

Pricing

Partition removal in offices is often priced as part of a wider reinstatement, where published market ranges run about S$12 to S$20 per square foot of office space, with Grade A CBD buildings at the top end.

Where partitions are the only item, we price by length and type of partition, number of doors, after-hours requirements and disposal. The office reinstatement cost guide explains what moves the price, and our office reinstatement service covers the full handover.

Request a quote with your floor plan and lease end date.

How we carry out the works

  1. 1

    Survey and scope

    Confirm which partitions, doors and fittings come out, and what the lease and handover record require.

  2. 2

    Building approval

    Submit the work permit, method statement and insurance documents to building management, and book after-hours slots.

  3. 3

    Isolate and protect

    Isolate power and data in the partitions, and protect carpet, ceiling and adjoining finishes.

  4. 4

    Dismantle

    Remove glass panels, doors, frames, boards and studs in sequence, handling glass safely.

  5. 5

    Make good and clear

    Make good the floor and ceiling tracks and remove debris through the loading bay at permitted times.

check_circle What is included

  • check Building management submissions
  • check After-hours scheduling
  • check Isolation of power and data in partitions
  • check Dismantling of glass, drywall and demountable partitions
  • check Making good of floor and ceiling junctions
  • check Debris removal and licensed disposal

cancel Not included

  • remove Ceiling grid replacement
  • remove Carpet replacement
  • remove Fire protection modifications and certification
  • remove Painting

Glass and Drywall Partition Removal questions

Can office partitions be removed during working hours?

add
Quiet dismantling can sometimes be done in working hours, but most office buildings require noisy works to be carried out at night or on weekends. We schedule around the building rules and book loading bay and lift slots in advance.

Will removing glass partitions damage the ceiling or carpet?

add
Some making good is always needed where the tracks were fixed. We protect the carpet and ceiling during removal and point out any tiles or carpet that will need replacing to meet the reinstatement standard.

Can glass partitions be reused?

add
Demountable systems and some framed glass can be removed for reuse if planned in advance. Frameless glass fixed in place is harder to salvage. Tell us at the survey if you want anything kept.

How much does office partition removal cost?

add
It is usually priced within a wider reinstatement, where published ranges are about S$12 to S$20 per square foot of office. Stand-alone partition removal is priced by length, type, doors, after-hours work and disposal.

Get a site survey for your hacking works

Send us your floor plan or a few photos and we will advise what can be hacked, what needs a permit, and how long the works will take.