Condo Hacking Services in Singapore
MCST submissions, lift and common area protection, and works scheduled within building rules.
Hacking in a private condominium
Condominium hacking follows the same structural logic as an HDB flat, but the approval route and the site constraints are different. Approval comes from the MCST rather than HDB, and building management rules often shape the programme more than the work itself does.
MCST approval
Most managements require a renovation application before granting access. Typical requirements include:
- A completed renovation application with drawings of the proposed work
- A refundable deposit against damage to common property
- Proof of contractor insurance
- An agreed work schedule within the development's permitted hours
- Contractor and worker details for access passes
Requirements vary between developments, sometimes substantially. Obtain the specific rules for your condominium early, because they determine what is possible and when.
Structural alterations may need more
Where works affect the structure, approval from the Building and Construction Authority may also be required in addition to MCST consent. The MCST cannot authorise a structural alteration on its own.
As in any building, reinforced concrete walls, beams, columns and slabs cannot be removed or cut into.
Common constraints in condominiums
These rules appear repeatedly across developments and affect the programme:
- Restricted working hours, often narrower than the statutory limits
- Designated service lift use, with protective padding required and time slots booked in advance
- Debris removal at set times only, sometimes outside normal working hours
- Protection of lift lobbies and corridors along the access route
- No works on weekends or public holidays in many developments
A job that would take a set number of days in a landed property can take noticeably longer in a condominium purely because of access windows.
Protecting common property
The deposit exists because damage to common property is the management's main concern. Lift interiors, lobby floors, corridor walls and the access route all need protecting before material moves through them.
Protection is usually inspected before work starts and again at the end before the deposit is returned.
Neighbours
Condominium walls and slabs transmit noise efficiently, and hacking is heard well beyond the adjoining unit. Where the management requires notice to neighbours, comply with it. Where it does not, giving notice anyway reduces complaints considerably.
For typical market prices across walls, floors, toilets, kitchens, ceilings and disposal, see our hacking price list. For walls specifically, see the wall hacking cost guide.