restore Reinstatement Services
Reinstatement Services in Singapore
Leased premises returned to original condition, on schedule for your handover date.
What reinstatement means
Reinstatement is the work of returning a leased premises to the condition required by the tenancy agreement at the end of the lease. For most commercial leases in Singapore that means stripping out the tenant's fit-out and handing back a bare unit.
It is a contractual obligation rather than an optional tidy-up. What has to be removed, and what condition the unit must be left in, is set by the lease and by the handover record from when the tenancy began.
Start with the documents
Two documents define the scope:
- The tenancy agreement, which sets out the reinstatement obligation and any specific exclusions
- The handover condition record, usually a schedule of condition with photographs taken when the unit was first taken over
Without the second document, the scope becomes a matter of argument. Landlords reasonably ask for the unit back as it was handed over, and without a record of that condition the discussion tends to default to whatever the landlord remembers. Locate it before agreeing any scope.
Dilapidation walk
A dilapidation walk compares the current state of the unit against the handover record, item by item. It establishes what actually needs reinstating and, equally usefully, what does not.
Some fit-out elements may have been in place at handover, or may be items the landlord wants retained. Removing them is wasted work and can create an additional making-good obligation.
Typical scope
- Partitions, glazed screens and internal doors installed by the tenant
- False ceilings, bulkheads and lighting
- Carpets, raised flooring and floor finishes
- Data and power cabling installed by the tenant
- Built-in joinery, pantries and reception counters
- Signage and applied branding
- Making good to walls, floors and ceilings
Timing
Reinstatement has a hard deadline, which distinguishes it from most construction work. The unit has to be handed back by the lease end date, and the programme is planned backwards from that point.
Building management rules usually restrict noisy work to outside office hours, which lengthens the programme considerably compared to the same work in an empty building. Access, lift booking and debris removal windows all need to be factored in.
Where reinstatement is not complete by the lease end date, leases commonly allow the landlord to charge holding-over rent, or to carry out the works and bill the tenant. Both outcomes cost more than planning the programme properly.
Building management requirements
Most commercial buildings require a permit to work before any contractor starts. Typical requirements include method statements, risk assessments, insurance details, worker access passes and agreed working hours.
These take time to arrange. Starting the approval process late is one of the more common reasons a reinstatement programme slips.
For typical market rates per square foot and worked budgets, see our reinstatement cost guide.