Skip to content
foundation Wall Hacking.sg

bathroom Hacking Services

Bathroom and Toilet Hacking in Singapore

Careful strip-out that protects the waterproofing layer beneath your bathroom floor.

Bathroom strip-out

Bathroom hacking covers the removal of wall and floor tiles, sanitary ware, bathtubs, vanity units and partitions, taking the room back to a state ready for re-tiling. It is a small space that carries more risk than its size suggests, because of what sits under the floor.

The waterproofing membrane is the main concern

A waterproofing membrane sits beneath the screed in every bathroom. Hacking through to the slab breaches it, and a breached membrane lets water into the unit below.

The consequences appear weeks later as staining on a neighbour's ceiling, by which point the new bathroom is finished and getting back to the membrane means removing it again. This is why bathroom hacking is worth doing carefully rather than quickly.

The right approach is working to the tile bed rather than through it, and inspecting the membrane once tiles are off. If it has been disturbed, it needs reinstating and testing before anything new goes down.

What comes out

  • Wall tiles and their bedding
  • Floor tiles and screed, within permitted limits
  • Sanitary ware including WC, basin and vanity
  • Bathtubs and shower enclosures
  • Built-in storage and mirror units
  • Non-structural partitions where the layout is changing

Approval

Removing bathroom tiles and screed needs a renovation permit. Where a partition is coming out as well, the structural position of that wall has to be confirmed first.

Services

Bathrooms concentrate plumbing and electrical services in a small area. Water supply needs isolating before work starts, and concealed pipework has to be identified so it is not damaged during removal. Where the layout is changing, drainage positions constrain what is possible more than most people expect: moving a WC is considerably harder than moving a basin, because of the fall required on the soil pipe.

Dust and access

A bathroom is enclosed, so dust concentrates. Screening the doorway and protecting the route out through the flat matters more here than in an open room. Debris is heavy for the volume, being mostly tile and screed.

Sequence

Strip-out, membrane inspection, any waterproofing reinstatement, testing, then re-tiling. The testing step is often skipped under time pressure and is the one that prevents the expensive outcome.

What bathroom hacking costs

Toilet hacking is priced by scope rather than by size. Removing the floor tiles only, stripping the walls and floor, and removing a built-in bathtub are very different jobs, and every job that goes down to the screed also needs the waterproofing redone and tested. The floor portion follows published tile hacking rates of about S$3 to S$8 per square foot, but in a small bathroom the fixed costs of protection, setup and disposal make up most of the bill.

Our toilet hacking cost guide explains each scope, the HDB rules on bathroom floors, and how long the work takes. Send us photos of each wall and the floor for a firm quote.

For typical market prices across walls, floors, toilets, kitchens, ceilings and disposal, see our hacking price list.

Related projects

Bathroom and Toilet Hacking questions

Do I need HDB approval before hacking a wall?

add
Yes. All hacking of walls in an HDB flat, whether partial or complete, needs written approval from HDB before works begin. This is issued as a renovation permit. Works carried out without a permit can result in a fine and an order to reinstate the wall at your own cost. We apply for the permit on your behalf as part of the job.

Which walls in my flat can be hacked?

add
Non-structural walls can usually be hacked with approval. Structural walls, reinforced concrete walls, columns, beams and household shelters can never be hacked. In most HDB flats the walls around the household shelter and certain internal walls are structural. We confirm which is which from your floor plan before quoting, and flag anything that will not be approved.

What hours can hacking works be carried out?

add
Noisy works such as hacking and heavy drilling are restricted to weekdays, generally 9am to 5pm. They are not permitted on Saturdays, Sundays or public holidays. Quieter renovation work has a wider window. We schedule hacking inside the permitted hours and plan low-noise tasks around them so the job still finishes on time. Check the current hours with HDB or your building management before fixing dates, as the rules are periodically updated.

How long do hacking works usually take?

add
A single wall opening in an HDB flat is often a one-day job. A full flat strip-out including floor tiles, bathroom and kitchen typically runs three to five working days. Commercial reinstatement depends on floor area and what has to come out, and we give you a day-by-day programme with the quotation.

Do you clear the debris afterwards?

add
Yes. Debris removal and disposal at licensed facilities is included in our scope unless stated otherwise. We sort waste on site where required, protect common corridors and lifts during removal, and leave the unit swept clean at the end of works.

Get a site survey for your hacking works

Send us your floor plan or a few photos and we will advise what can be hacked, what needs a permit, and how long the works will take.