F&B Unit Strip-Out and Reinstatement
Fittings, signage and finishes removed from a bistro unit ahead of lease handover, with the glazed frontage masked and protected throughout.
What the job involved
A bistro unit was coming to the end of its lease and had to be returned to the condition set out in the tenancy agreement. The unit had a full-height glazed frontage in dark powder-coated framing, which the landlord required to be handed back undamaged.
How we approached it
We walked the unit against the original handover record first, so the scope covered what the lease actually required rather than stripping more than was needed. Loose fittings, signage and soft furnishings came out first, followed by the fixed items.
Protecting what stays
The glazed frontage and the existing timber-effect flooring were masked and sheeted before any tools came onto site. Anything scheduled to remain under the lease was protected for the full duration and checked again at handover.
Scope of works
- check_circle Dilapidation walk against the original handover record
- check_circle Remove loose fittings, signage and furnishings
- check_circle Dismantle fixed joinery and service runs
- check_circle Mask and protect the glazed frontage
- check_circle Protect flooring scheduled to remain
- check_circle Clear and dispose of all debris
Project photos
2 photos, tap any to enlarge

