Skip to content
foundation Wall Hacking.sg

location_on East

Wall Hacking Services in Tampines

Hacking and reinstatement works for HDB flats, executive maisonettes and condominiums in Tampines.

Hacking works in Tampines

Tampines is one of the largest towns in Singapore and the housing stock varies more here than almost anywhere else we work. A flat near Tampines Central may date from the early 1980s, while a unit in Tampines North was handed over in the last few years. The difference is not cosmetic. Older Tampines blocks were built with thicker masonry partitions and cement screed beds under the floor tiles, which means more debris, longer hacking time and a heavier disposal load than a recent BTO of the same floor area.

Maisonettes and larger layouts

Tampines has a meaningful number of executive maisonettes, and they come up often in our enquiries. The internal staircase in a maisonette is structural and the wall it runs against usually is too. Owners sometimes ask about removing or relocating that staircase wall to open the lower floor. In most of the maisonette layouts we have surveyed, that is not possible without an engineer's endorsement, and in several it is not possible at all. We say so at the survey rather than after the permit is rejected.

Access and scheduling

The older Tampines blocks near the town centre have smaller service lifts, and for those we plan debris removal in more trips with smaller loads rather than assuming a single clearance. Blocks around Simei and Tampines North are newer and pose no real access problem.

Estates we cover in Tampines

  • apartment Tampines North
  • apartment Simei
  • apartment Bedok Reservoir View
  • apartment Tampines Central
  • apartment Pasir Ris Drive

info Working in Tampines

Tampines spans a wide range of flat ages, from 1980s blocks near the town centre to recent BTO projects in Tampines North. We confirm the block's completion year before quoting, because it changes what is behind the wall.

Services available in Tampines

Hacking works in Tampines

Do I need HDB approval before hacking a wall?

add
Yes. All hacking of walls in an HDB flat, whether partial or complete, needs written approval from HDB before works begin. This is issued as a renovation permit. Works carried out without a permit can result in a fine and an order to reinstate the wall at your own cost. We apply for the permit on your behalf as part of the job.

Which walls in my flat can be hacked?

add
Non-structural walls can usually be hacked with approval. Structural walls, reinforced concrete walls, columns, beams and household shelters can never be hacked. In most HDB flats the walls around the household shelter and certain internal walls are structural. We confirm which is which from your floor plan before quoting, and flag anything that will not be approved.

What hours can hacking works be carried out?

add
Noisy works such as hacking and heavy drilling are restricted to weekdays, generally 9am to 5pm. They are not permitted on Saturdays, Sundays or public holidays. Quieter renovation work has a wider window. We schedule hacking inside the permitted hours and plan low-noise tasks around them so the job still finishes on time. Check the current hours with HDB or your building management before fixing dates, as the rules are periodically updated.

How long do hacking works usually take?

add
A single wall opening in an HDB flat is often a one-day job. A full flat strip-out including floor tiles, bathroom and kitchen typically runs three to five working days. Commercial reinstatement depends on floor area and what has to come out, and we give you a day-by-day programme with the quotation.

Do you clear the debris afterwards?

add
Yes. Debris removal and disposal at licensed facilities is included in our scope unless stated otherwise. We sort waste on site where required, protect common corridors and lifts during removal, and leave the unit swept clean at the end of works.

Do you work with interior designers and renovation contractors?

add
Regularly. We are often engaged directly by interior design firms and main contractors to handle the hacking and disposal phase before their own works begin. We can work to your programme and coordinate access with the other trades on site.

Get a site survey for your hacking works

Send us your floor plan or a few photos and we will advise what can be hacked, what needs a permit, and how long the works will take.